Pogues Run CSO 143 Basin Sewer Separation

City of Indianapolis, Indiana

The Problem

The Pogues Run Combined Sewer Overflow (CSO) 143 Basin Sewer Separation Project separates the combined portions of the CSO 143 Basin in order to eliminate the overflow while simultaneously correcting local flooding issues utilizing a green best management practice (BMP) approach. A scoping report was prepared in 2008 by the Indianapolis Clean Stream Team. This report recommended separating and alleviating local flooding by installing a conventional storm sewer system with mechanical BMP devices.

With Indianapolis’ desire to be the most sustainable City in the Midwest, Commonwealth was retained in late 2008 to investigate the use of “green” technologies in lieu of a traditional system. The CSO 143 Basin “Green” Feasibility Study consisted of modeling the existing combined system, including the storm portion, developing green infrastructure selection criteria, providing recommended alternatives and costs, investigating ways to engage the community, and addressing short and long-term maintenance.

The Solution

After meeting with the City and affected stakeholders, design began on the recommended alternatives. This project consisted of traditional sewers, bio-retention basins, bio-swales, and isolated rain gardens, which will not only address the separation of the CSO area and local flooding but it will provide an asset for the local community to enjoy. In addition to the design, we provided land acquisition services, bidding, and construction-related services.

During early discussions with City staff on this project, short and long-term maintenance was a major concern. Commonwealth addressed this concern by adding a second division to this project which will require the contractor who installs the basin to maintain it over a three (3) year period. This will allow the City to evaluate the effort and costs associated with maintaining sustainable infrastructure. In addition, Commonwealth, along with the City, developed a biological and chemical sampling and testing plan. This plan includes gathering data over a three (3) year period to set a baseline for the performance of future “green” projects. 

Additional Projects

Wastewater
Wastewater Treatment Plant Improvements – Greenfield, Indiana
Project Need Originally constructed in the 1960s, updated and expanded through the 2000s Includes one (1) main activated sludge wastewater treatment facility and two (2) trains of Actiflo high-rate settling… Read More
Wastewater
West Side Interceptor Improvements – Richmond, Indiana
Project Highlights Replace gravity sewers Collection system improvements Reduce combined sewer overflows Project Description The Richmond Sanitary District recently finished constructing over $6 million in collection system improvements, which involved… Read More
Wastewater
Wastewater Treatment Improvements – Syracuse, Indiana
The Problem Commonwealth was hired to investigate and provide solutions to an underperforming wastewater treatment system for their oxidation ditches, which was also impacting performance in their clarifiers, requiring frequent… Read More
Potable Water
Water System Improvements – Flora, Indiana
Water System Improvements Town of Flora, Indiana Commonwealth Engineers worked with the Town of Flora on a two-part project to make improvements to their water system. Division “A” – Water… Read More
Wastewater
Long Term Control Plan Improvements – Crown Point, Indiana
Commonwealth Engineers performed a Long Term Control Plan improvements for the City of Crown Point. It included: ANDERSON POND PROJECT The Crown Point Anderson Pond Project is a Long Term… Read More
Wastewater
Long Term Control Plan & Sewer System Modeling – Madison, Indiana
Long Term Control Plan & Sewer System Modeling City of Madison, Indiana Commonwealth Engineers performed a Value Engineering / Alternatives Assessment of the City’s CSO Collection System Improvements Project. Coordinated… Read More
Potable Water
Water System Improvements Project – West Terre Haute, Indiana
A Preliminary Engineering Report and Environmental Report were conducted to address West Terre Haute’s water system concerns.  Reports were completed in compliance with USDA Rural Development/State Revolving Fund Standards to… Read More
Wastewater
Long Term Control Plan Improvements Project – Nappanee, Indiana
Long Term Control Plan Improvements Project City of Nappanee, Indiana CSO Interceptor and Wet Weather Treatment and Storage Facilities Project This project provides collection and treatment of excessive combined sewage… Read More
Wastewater
Wastewater Treatment Plant Improvements – Fairmount, Indiana
Wastewater Treatment Plant Improvements Town of Fairmount, Indiana Commonwealth Engineers, Inc. performed value engineering and construction oversight/inspection for the noted WWTP Improvements Project. Efforts commenced with our Value Engineering (VE)… Read More